NAG Library Manual, Mark 28.7
Interfaces:  FL   CL   CPP   AD 

NAG FL Interface Introduction
Example description

 G13AHF Example Program Results

 The required 12 forecast values are as follows
   6.0381  5.9912  6.1469  6.1207  6.1574  6.3029  6.4288  6.4392
   6.2657  6.1348  6.0059  6.1139

 The standard deviations corresponding to the forecasts are
   0.0374  0.0451  0.0517  0.0575  0.0627  0.0676  0.0721  0.0764
   0.0805  0.0843  0.0880  0.0915